- Email Maintainer
-
fig1d_S1CA0h_5mPt.xlsx
عنوان الموقع URL: https://datahub.h2awsm.org/dataset/f3c4a13e-38f2-425c-96db-28e8f110fab3/resource/7907ad95-f7ad-40ae-899a-d0332df4c85e/download/fig1d_s1ca0h_5mpt.xlsx
Two Si/GaN photocathodes were compared. Sample #1 (named as S#1) was the as-received sample. The initial PEC performance (J-V curve) was recorded. Then a photodeposition of Pt was performed with each loading time set to be 5 minutes, then the photocurrent density vs voltage (J-V) curve was recorded to track the changes of the performance. The Pt photodeposition was stopped until the J-V curve won't shift (the maximum onset potential was achieved). The results show that, S#1 needs at least 20 minutes of Pt photodeposition to achieve its best PEC performance.
Resource Metadata
data source | LBL PEC Stand 1 |
---|---|
lab environment | Indoor Lab |
measurement | Biased |
measurement type | JV |
metadata modified | قبل 5 سنوات |
mimetype | application/vnd.openxmlformats-officedocument.spreadsheetml.sheet |
size | 24.1 كيلوبايت |
آخر تحديث | 4 فبراير 2021 |
---|---|
أنشئت | 4 فبراير 2021 |
تنسيق | application/vnd.openxmlformats-officedocument.spreadsheetml.sheet |
الترخيص | لم يتم تزويد أية رخصة |