- Email Maintainer
-
Metadata - Fig1d - Pt deposition.xlsx
عنوان الموقع URL: https://datahub.h2awsm.org/dataset/f3c4a13e-38f2-425c-96db-28e8f110fab3/resource/fed5f5af-cff9-4055-ac94-4461fa349237/download/metadata-fig1d-pt-deposition.xlsx
Metadata for Fig1d. Two Si/GaN photocathodes were compared. Sample #1 (named as S#1) was the as-received sample, and sample #2 (named as S#2) was CA tested for 4 hours under same testing conditions described in Fig.1a. The PEC performance (J-V curve) was recorded for both samples. Then a photodeposition of Pt was performed on both samples, each loading time was set to be 5 minutes, then the J-V curve was recorded to track the changes of the performance. The Pt photodeposition was stopped until the J-V curve won't shift (the maximum onset potential was achieved). The results show that, S#1 needs at least 20 minutes of Pt photodeposition to achieve its best PEC performance while S#2, which is after CA testing, only needs 5 minutes of Pt photodeposition to achieve its best PEC performance.
لا توجد صيغ عرض منشأة لهذا المورد بعد.
Resource Metadata
data source | LBL PEC Stand 1 |
---|---|
lab environment | Indoor Lab |
measurement | Biased |
measurement type | JV |
metadata modified | قبل 5 سنوات |
mimetype | application/vnd.openxmlformats-officedocument.spreadsheetml.sheet |
size | 13.6 كيلوبايت |
آخر تحديث | 4 فبراير 2021 |
---|---|
أنشئت | 4 فبراير 2021 |
تنسيق | application/vnd.openxmlformats-officedocument.spreadsheetml.sheet |
الترخيص | لم يتم تزويد أية رخصة |